SLYD
Read first

The 5-step pipeline.

How energy turns into a deployed, financed, offtake-matched cluster, and what SLYD does at every step.

How SLYD works →
Hardware

New and recovered GPU systems.

NVIDIA and AMD systems through documented manufacturer and qualified channel supply, with financing and deployment coordinated on the same platform.

Explore GPU hardware →
Marketplace

Compute, hardware, and power in one book.

Browse available GPU capacity by accelerator, configuration, region, and price, or bring supply to qualified demand.

Open marketplace →
Pre-qualify

Start with an indicative structure.

Tell us deal size, structure, and offtake. Any range is preliminary and subject to underwriting, diligence, and documentation.

Open Configure →
From the blog

GPU market trends and deployment playbooks.

Infrastructure best practices, hardware comparisons, and industry analysis from the SLYD team.

Read the blog →

Library

AI infrastructure

Plan the complete AI infrastructure stack

Accelerators are one decision inside a system. This page works through the rest of it: interconnect, storage, power, cooling, site readiness, deployment path, and the sourcing route that fits the requirement.

What is AI infrastructure?

AI infrastructure combines accelerated compute with the networking, storage, power, cooling, software, and operational controls required to run AI workloads reliably. SLYD helps organizations translate workload, scale, location, timeline, and commercial requirements into a system plan, then evaluate sourcing, financing, and deployment paths for the required components.

Step one

Start with the workload, not the product

The workload determines which parts of the system are actually under pressure. Naming it precisely is the difference between a design that scales and a rack of equipment that does not fit the job.

Training

Pretraining and large-scale training

Bound by collective communication across many accelerators. Interconnect topology, bandwidth, congestion behavior, and job resiliency dominate the design.

Fine-tuning

Fine-tuning and post-training

Smaller node counts, shorter jobs, frequent iteration. Accelerator memory and fast checkpoint storage usually matter more than fabric scale.

Inference

Inference and serving

Bound by accelerator memory, latency target, and cost per request. Often scales as many independent replicas rather than one tightly coupled cluster.

Visual

Rendering and visualization

Graphics and media pipelines with different accelerator, display output, and software certification requirements than data-center training systems.

HPC

Simulation and technical computing

Often needs double-precision performance, deterministic scheduling, and parallel file system throughput that AI-first designs do not prioritize.

Mixed

Mixed and shared estates

Multiple teams and job types on shared capacity. Partitioning, scheduling, and isolation requirements shape the system as much as raw performance.

Translation

Turn workload requirements into system requirements

Each workload property maps onto a concrete part of the system. Working through the mapping first keeps the conversation about requirements rather than product preference.

How workload properties drive system decisions. Thresholds are project specific and are set against the models, software stack, and service targets in scope.
Workload property Primary system consequence What to confirm
Model size and precision Accelerator memory per device and per node Whether the model, activations, and KV cache fit without excessive sharding
Parallelism strategy Scale-up domain size and interconnect generation How many accelerators must communicate as one tightly coupled domain
Cluster scale Scale-out fabric, topology, and oversubscription Switch tiers, cabling distances, and failure domains
Dataset and checkpoint size Storage capacity, throughput, and data path Sustained read and write rates during real job phases, not peak specifications
Latency and concurrency target Replica count, batching design, and placement Whether the target is achievable on the intended accelerator and software stack
Utilization profile Own, colocate, or rent decision Expected sustained utilization over the asset life
Data control requirement Deployment location and tenancy model Where data may reside and who may operate the environment
Deployment path

Compare where the system will live

General characteristics of each path. The right choice depends on the specific utilization profile, capital structure, data requirements, and site options in scope.
Path Fits when Main constraint to test
On premises Data control, existing facility capacity, and sustained utilization justify ownership Whether the building can actually take the power, thermal, and structural load
Colocation Ownership is wanted without operating a facility Available density per rack, cooling method supported, and contract term against refresh cycle
Cloud or marketplace capacity Demand is variable, short-lived, or still being characterized Cost at expected sustained utilization and data residency requirements
Hybrid A predictable base load sits alongside variable demand Operational complexity of running two environments and moving data between them

If the requirement is compute rather than owned equipment, the GPU Cloud Marketplace is the path to evaluate first.

Platform selection

Accelerator and manufacturer families

Each page below covers one family, with the manufacturer's own current specifications and the system questions that go with it. Full side-by-side specifications live in the GPU database. Product names are descriptive and do not indicate availability.

Accelerator families

Manufacturer families

What we need from you

Build the requirements package

Start with whatever is known. Gaps are normal, and the unknowns are usually the first thing worth working on together.

  • Workload and scale
  • Target systems, if already selected
  • Site or colocation location
  • Existing utility and cooling capacity
  • Target deployment date
  • Redundancy requirement
  • Growth plan
  • Known constraints, including capital structure
Governance

What is verified before anything is represented

Price, condition, availability, warranty, and lead time change by product, supplier, geography, and transaction. None of them are page content. They are confirmed for the specific equipment and quantity, with the confirmation date and scope stated.

  1. Requirement

    Workload, architecture, quantity, location, timing, budget, condition tolerance, and deployment constraints are captured before supply is evaluated.

  2. Supply qualification

    Configuration, seller authority, provenance, condition, availability, commercial terms, and applicable compliance requirements are reviewed for the specific transaction.

  3. Whole-transaction comparison

    Equipment cost is evaluated together with networking, storage, power, cooling, logistics, warranty, financing, and deployment implications.

  4. Buyer decision

    The buyer reviews the specific quote, evidence, counterparties, and governing terms before any transaction proceeds.

Product names on SLYD pages are descriptive. They are not statements of stock, allocation, authorization, or availability.

FAQ

AI infrastructure questions

What is AI infrastructure?

AI infrastructure is accelerated compute plus the networking, storage, power, cooling, software, and operational controls required to run AI workloads reliably. Treating the accelerator as the whole system is the most common planning error, because the surrounding infrastructure usually decides what can actually be deployed at a given site.

How do I size AI infrastructure for my workload?

Start from the workload rather than the product. Model size, precision, context length, dataset size, concurrency, and latency target drive accelerator memory and interconnect requirements. Those requirements then drive server form factor, rack density, network fabric, storage throughput, power draw, and cooling method, which are constrained in turn by the site.

What is the difference between training and inference infrastructure?

Training is usually bound by collective communication across many accelerators, so it is sensitive to interconnect bandwidth, topology, and job resiliency. Inference is usually bound by accelerator memory, latency, and cost per request, and often scales as many smaller independent replicas. The same accelerator can suit both, but the surrounding network, storage, and redundancy design differs.

Should I deploy on premises, in colocation, or in the cloud?

It depends on utilization, data control, capital structure, timeline, and available site capacity. Sustained high utilization and strict data control favor owned systems. Variable or short-lived demand favors rented capacity. Many organizations combine both, owning a base of capacity and renting for peaks or experiments.

What power and cooling capacity does a GPU deployment need?

It is configuration specific. The requirement follows from the exact server model, accelerator count and power profile, rack layout, redundancy target, and facility conditions. A design that works in one building can be undeployable in another with the same equipment, so utility capacity, thermal capacity, floor loading, and cabling paths are checked before a system is selected.

Does a product named on this page mean SLYD has it available?

No. Product and platform names are used descriptively to explain architecture choices. Availability, condition, price, lead time, and warranty are confirmed at the transaction level for the specific configuration, quantity, and geography requested.

What does SLYD verify before representing a system?

Configuration, seller authority, provenance, condition, availability, commercial terms, and applicable compliance requirements are reviewed for the specific transaction. Testing, warranty, and condition evidence are disclosed for the specific equipment when they exist rather than asserted as a blanket page claim.

What should I have ready to start an infrastructure conversation?

Workload and scale, target systems if already chosen, site or colocation location, existing utility and cooling capacity, target deployment date, redundancy requirement, growth plan, and known constraints. Incomplete information is normal at first contact, and the unknowns themselves shape the first round of work.

Work through an infrastructure requirement

Share the workload, scale, location, timeline, and constraints. That requirement drives the system plan and which sourcing, financing, and deployment paths are evaluated.

Page updated: August 18, 2026

Reconnecting to the server...

Please wait while we restore your connection

An unhandled error has occurred. Reload 🗙