SLYD
This week

5.2 MW of B200 coming online Q2 2027.

Refinery-tail site in Texas. Refundable deposits open. 24% subscribed — earliest deposits priced lowest.

See Lot 0224 →
Live forward book

12.4 MW under refundable deposit.

Six lots, four regions, three quarters of forward delivery. Spot capacity priced and available now.

Open marketplace →
Pre-qualify

Indicative terms in 30 seconds.

Public financing curve. Tell us deal size, structure, and offtake — we'll quote a range without pulling credit.

Open Configure →
Latest case study

Permian Basin → 3.4 MW H200 in 11 weeks.

How one operator turned stranded gas into financed, offtake-matched compute. Public-approved numbers, real timeline.

Read case study →
/configure · energy-backwards

Configure a deployment.

Energy in, compute out. Start from whichever number you actually know — power envelope, GPU count, budget, or IT load — and SLYD sizes a buildable, financable package against its live pricing engine.

1Your input

MW
200 kW10 MW20 MW+

2Accelerator

Loading catalog…

3Cooling

4Sourcing

5Offtake → financing

Pre-secured, escrowed offtake lowers the APR and lifts the advance rate — the §5.2 lever. The rate steps at the published threshold; any committed fraction below it prices at the partial tier.
RE-CALCULATING · LIVE

Save this build. Start the conversation.

Sign in to save this configuration and get a structured proposal from ops — exact pricing tied to real lots, financing terms, delivery timeline. Capacity is held only via deposit.

Talk to us
BANDED PUBLIC ESTIMATE — SIGN IN FOR EXACT-TO-THE-CENT QUOTES TIED TO REAL LOTS
Banded public estimate. Every number below comes from SLYD's published pricing engine — output is banded (). Sign in for exact-to-the-cent quotes tied to real lots.

POWER ENVELOPE · ALLOCATION

PUE · LIVE
Compute draw · GPU nodes
IT overhead · network + storage + mgmt
Facility · cooling + UPS + losses
Pick an input to size the envelope — PUE and the IT-overhead ratio come from the published pricing config.
RECOMMENDED BUILD

Sizing…

GPUs
Nodes
Racks
IT load
Meter power
PUE
ALL-IN BUILD COST · BANDED
$—$—
BANDED
Compute hardwareGPUS · CHASSIS · KIT
Electrical$/kW · SITE POWER
Cooling plant$/kW · METHOD-DEPENDENT
NetworkingTOP-OF-RACK · PER SERVER
Install & commissioningPER NODE + FRACTION OF STACK
Enclosure & packageREMAINDER OF STACK
Shares of the banded total. Dollar line items are quoted lot-by-lot after sign-in.
FINANCING · INDICATIVE

Offtake is the lever. Escrowed commitments buy the rate down.

APR
ADVANCE RATE
EST. MONTHLY
TERM
Monthly is a simple-interest estimate on the financed principal, banded. No credit pull at this stage.
IF YOU SELL THE CAPACITY

Est. annual revenue $— — $—

SLYD CLOUD · OPERATING LAYER

Building a neocloud? Don't reinvent the stack.

If this cluster will serve tenants, SLYD Cloud handles orchestration, billing, tenant isolation, GPU scheduling, and marketplace exposure — you sell capacity, not build software.

OPTION 01 · LICENSE

Run SLYD Cloud on your own metal.

Full stack, white-label optional, on-prem control plane — the same orchestration, billing, and tenant primitives SLYD runs.

PER-GPU-HOUR LICENSE · QUOTED WITH YOUR BUILD
OPTION 02 · CONNECT

Plug into the SLYD marketplace.

Your capacity surfaces as your inventory. Customers find you; you keep the relationship. SLYD takes a clearing fee on bookings it sources.

REV-SHARE · NO LICENSE FEE · SLYD-SOURCED BOOKINGS ONLY
Configurator questions

How the configurator works.

Do I need to sign up to use the configurator?

No. The configurator is public and every output is a banded estimate from SLYD's published pricing engine. Signing in unlocks exact-to-the-cent quotes tied to real lots, lets you save the build, and starts a structured proposal from ops with financing terms and a delivery timeline.

What does energy-backwards sizing mean?

You start from whichever number you actually know — site power at the meter, GPU count, build budget, or post-PUE IT load — and SLYD sizes a buildable, financable package. PUE and the IT-overhead ratio come from the published pricing config, so the power envelope allocation stays honest.

Why is pricing shown as a band instead of an exact number?

Public output is banded on purpose. Every figure comes from SLYD's published pricing engine, but exact-to-the-cent pricing is tied to a real lot and sits behind sign-in. Dollar line items — compute, electrical, cooling, networking, install — are quoted lot-by-lot after you save the build.

How does committed offtake change the financing terms?

Pre-secured, escrowed offtake is the lever: committing a fraction of the cluster's capacity forward lowers the indicative APR and lifts the advance rate. The rate steps at a published threshold — any committed fraction below it prices at the partial tier, and the configurator shows the change live.

Can I compare new and recovered hardware in the same build?

Yes. The sourcing step switches between new hardware through SLYD's OEM partners and recovered grade-A hardware, which offers deeper savings. Cooling choices — air, direct liquid, or immersion — each carry their own PUE from the pricing config, so the build cost and power envelope update as you toggle.

Reconnecting to the server...

Please wait while we restore your connection

An unhandled error has occurred. Reload 🗙