Enterprise Hardware Marketplace
Certified pre-owned and new AI infrastructure. Servers, GPUs, networking, data center equipment, and power infrastructure with competitive pricing and expert deployment support.
Products
0 itemsNo products found
Try adjusting your filters or search for something else.
Power Infrastructure for GPU Data Centers
UPS systems, intelligent PDUs, transformers, and distribution equipment from Eaton, Vertiv, APC, and other enterprise vendors.
What's Available
UPS Systems
10kVA to multi-megawatt configurations for critical load protection
Intelligent PDUs
Rack-mount units with per-outlet monitoring, switching, and environmental sensors
Transformers
Step-down and isolation transformers for voltage conversion and power conditioning
Switchgear & Generators
Distribution panels, automatic transfer switches, and backup power generators
Selection Guide
Capacity Planning
An 8x H100 server draws ~10kW. Add 30-40% for cooling and infrastructure overhead.
Redundancy
N+1, 2N, or 2N+1 redundancy based on uptime requirements. Critical training jobs justify higher redundancy.
Efficiency
Modern UPS systems achieve 96-99% efficiency. Small gains significantly reduce power costs at scale.
Monitoring
Per-outlet monitoring enables accurate power attribution, capacity tracking, and thermal management.
Unreliable power is the leading cause of unplanned AI workload interruptions. Contact our specialists for integrated power infrastructure quotes.
Common Questions
What power equipment does the marketplace carry?
UPS systems from 10kVA to multi-megawatt configurations, intelligent rack-mount PDUs with per-outlet monitoring and switching, step-down and isolation transformers, plus switchgear, automatic transfer switches, and backup generators from Eaton, Vertiv, APC, and other enterprise vendors.
How much power capacity should I plan for GPU servers?
An 8x H100 server draws roughly 10kW, and you should add 30-40% for cooling and infrastructure overhead. Per-outlet monitoring on intelligent PDUs helps with accurate power attribution and capacity tracking as you scale.
What redundancy level do I need?
Choose N+1, 2N, or 2N+1 redundancy based on your uptime requirements. Critical training jobs justify higher redundancy, since unreliable power is the leading cause of unplanned AI workload interruptions.
Does UPS efficiency matter?
Yes. Modern UPS systems achieve 96-99% efficiency, and at data center scale even small efficiency gains significantly reduce power costs over the life of a deployment.